Development of in-house power generation

• Three gas-fueled units with a heat-recovery system are to be installed from 2016 to 2018

    Project goals:

  • To increase in-house generating capacity by 55 MW;
  • To meet the enterprise’s needs in the electric energy of in-house generation to the maximum;
  • To reduce the costs of electric energy consumed by the enterprise;
  • To improve reliability of electric power supply to the enterprise;
  • To enhance reliability of heat supply to the northern part of Solikamsk in the heating period.

    Project tasks:

  • o To install three gas-fueled power generation units with heat-recovery boilers for water heating.